Customising Your Protection Case Studies

Customer name:

Anchor

Solution:

Customising your protection

Service:

Electrical testing; electrical and mechanical installations, Remedial/Installation

How we protect them

Anchor is the country’s largest provider of housing and care for older people. With vulnerable people occupying their residencies, the highest possible standards need to be maintained.

Across over a thousand locations across the UK, Veriserv delivers a customised package of electrical testing and LOLER lift inspections. To meet the high specification of work and high levels of reliability required by Anchor, meant Veriserv creating bespoke systems and processes that would meet their very particular needs and keep tens of thousands of residents safe, secure and protected across the country.

Protecting what’s valuable

  • Protecting vulnerable residents.
  • Protecting everything, everywhere to the same high standards.
  • Protecting time – dealing with one single point of contact at Veriserv who orchestrates everything across all locations and across all the required disciplines.

Customer name:

St Andrews Hospital

Solution:

Customising your protection

Service:

Electrical installation

How we protect them

This project, won by competitive bid, required bollard, pathway and street lighting replacing for our client. This to achieve their energy efficiency initiatives.

In most instances existing lighting was already in place as the intended works were also part of a refurbishment programme. Replacing electrical equipment "like for like" however is rarely straightforward, particularly when the existing equipment has been in service for many years and new technologies are being retrospectively fitted.

With this project the difficulties were made greater due to the number of differing fittings across a number of large sites.

During the project it was clear that there would never be a "one size fits all" approach with modifications to existing equipment requiring precision and efficiency while complimenting the aesthetic of the original structure or surroundings.

The project was set for two calendar months over the various sites requiring tight management of the programme to meet the strict deadline.

We were delighted to handover to our client the completed job along with all supporting certification and manuals in good time for their next board meeting.

Protecting what’s valuable

  • Protecting the public & employees.
  • Protecting operational functionality
  • Protecting everywhere and everything to the same high standards
  • Protecting Key Performance Targets